Testing Facility/ Machinery/ Equipments

Donec quis felis commodo orem ipsum is simply free text dolor sit amet.
PE has set up a complete quality management system to offer the best customer satisfaction. Nothing has a higher priority than quality in engineering, in manufacturing, in sales and in services. The KOTSONS total quality program is based on the philosophy of prevention, and not just on the detection and correction of problems after the occur. In its quest to exceed the customers expectation by meeting their specified and implied needs at competitive prices and to ensure products and services of agreed quality on time every time.
All transformers are subjected to all routine tests in our sophisticated laboratory in factory confirming to latest national and international standard specifications. Tests are intended for use for the basic validation of design and the basis for performance, safety, and reliability of the transformers.
  • Ratio , polarity and phase sequence
  • No load current and losses at rated frequency , rated voltage and at 90% and 110%voltage
  • Load losses at rated current and normal frequency
  • Impedance voltage test
  • Resistance of windings
  • Insulation resistance
  • Induced over voltage withstand test
  • Separate source voltage withstand test
  • Measurement of winding resistance (at all taps if applicable )
  • Measurement of voltage ratio , polarity , phase sequence and vector group
  • Measurement of short circuit impedance (principle tapping , when applicable)
  • Load losses at rated current and normal frequency at50% and 100% load
  • Measurement of no load loss and current
  • Measurement of insulation resistance
  • Induced over voltage withstand test
  • Separate source voltage withstand test
  • Pressure test
  • Oil leakage test
  • Oil samples (one sample per lot) to comply with IS1866
  • Measurement of no load losses and magnetizing current at rated frequency and at 90% , 100% and 112% voltage
  • Heat run – Temperature rise test as per IS 2026 Part -2 for determining the maximum temperature rise after continuous full load run
  • Lightening impulse voltage test – as per clause no. 13 ( with chopped wave ) of IS -2026 -part 3 latest version . BIL for 11kv shall be minimum 95kv peak.
  • Vacuum test – as per IS -1180 /part-1 / 2014
  • Pressure test – as per IS -1180 /part -1/ 2014 with latest amendments as per the clause NO. 21.5.2.1
  • Short circuit withstand test – thermal and dynamic ability
  • Magnetic balance test
  • Noise level measurement
  • Measurement of zero phase sequence impedance
  • Measurement of relief device test. The pressure relief device shall be subject to increasing fluid pressure. It shall operate before reaching the test pressure as specified in the above class . the operating pressure shall be recorded . the device shall seal- off after the excess pressure has been released.
  • Paint adhesion test
  • Test for Buchholz relay (above 1000 KVA )
  • Special test other than type and routine tests, as agreed between purchaser and bidder shall also be carried out as per the relevant standards.
Pratik

Wind Turbines

76%

Hybrid Energy

88%

Guarantee/ Warrantee of the Transformer

Reliability & performance

PE hereby warrant that the transformers supplied by us shall have no defect arising from the design, Materials or workmanship that may develop under normal use of the transformers in the conditions prevailing at the site of installation. 

This warranty does not cover accessories like porcelain bushings and its metal parts and breather. 

This warranty will be valid if the installation and maintenance of the transformers is not done as per our “Manual of installation, operation and maintenance” provided with the transformer. From the date of purchase order we will deliver the product within 3 to 4 weeks lead time..

The guarantee of the individual transformer to be supplied shall be for 24 (Twenty Four ) months from the date of delivery against any delivery manufacturing defect on account of improper design, bad workmanship or poor quality of raw material used etc. and any such defects occurring within the above period will be repaired/replaced by us free of cost.